Loading Rack Railways…
The real lines carry their terrain, so the first load can take a little while.
Rack Railways
☰ All lines
Scene
Snowdon: passing loop with Abt points, 1 in 10
Snowdon: 90° climb at 1 in 5½, 264 ft radius
Tanvald–Kořenov: T 426.0, Balm coach and a Dolní Polubný-like loop, 58 ‰
Pilatus: yard with the Y table, double track and traversers
Pilatus: 90° climb at 48 %, 80 m radius
SLM Abt 0-4-2T and carriage, 1896, on the Abt rack. A working-model generator at 16 mm scale from the 1896
Engineering
plates.
◀ Hide panel
■ Stop
▸ Controls
▼ Down
■ Stop
▲ Up
Slow motion (1/20)
Close
⇄ Lower points
⇄ Upper points
⇄ Lower table
⇄ Upper table
⇄ Lower
⇄ Middle
Train
Selected part, as printed
Side
Below
Drive close-up
Whole line
Lower table
Rack mesh
Follow the train
Show the bodies
Time of day
12:00
Fast ×10
Stop on the middle traverser
Dolní Polubný
1936–92 and from 2025: rack
1992–2025: no rack
Fast ×10
Fast ×10
Fast ×10
A second train, crossing at the loops
Stop on the transfer tables
Winter
Snowing
Regulator
0.0
6.7 km/h
set ·
standing
Up
Stop
Down
More
Stopped